天堂中文在线官网Iwww.色94色.comI狠狠撸视频I人妻无码一区二区三区久久I久久香蕉影院I福利网在线I豆花av在线I一区二区三区91I麻豆视频在线免费观看I欧美xxxx视频I国产1区2区3区I免费在线观看小视频Ia猛片免费播放I午夜福利一区二区三区I中文字幕无码人妻少妇免费I欧美激情在线看I四虎网站在线I日韩在线精品强乱中文字幕I99reeI97精品人妻一区二区三区香蕉I国内久久I日韩一区在线播放I日本特黄一级I女的被男的操I夜夜做天天干I91污网站

Contact Us

Inflatable Air Blower cleaning process

Date: 2015-1-5   Click: 1608 Times

Finishing "Inflatable Air Blower" must pay attention to the fan power cord and clip the button, the line to be sorted out in advance, do not let the fan run when working on the line to produce a variety of contact, the power cord is in the initial position of the fan in general (both removed available).
Adjust the position of the radiator
The radiator tune in the right place, the place "Inflatable Air Blower" level to the processor port cover side, four point deduction buckle clasp around the column (beak antennae) in the bottom of the need to align with the motherboard. The radiator tune into the right position, the fan will be placed horizontally to cover the processor port side, the four point deduction buckle clasp around the column (beak antennae) in the bottom of the need to align with the motherboard. Motherboard Intel processor buckle hole distribution in the vicinity of the CPU socket, the user can easily observe the board found. Intel original radiator have to look at before installing rotary switch is fully restored in situ. "Inflatable Air Blower" As a result of the heat sink clip clip pressed four buckle design, so the best way is to install the clip "diagonal" push installation method. Order push uneven force likely to cause the fan, causing the other two buckle pressing difficulties.

Back to: Industry news

+86-0769-83660708

Home Product News Contact

主站蜘蛛池模板: 峨山| 军事| 美姑县| 克拉玛依市| 合江县| 福海县| 左权县| 恩施市| 诸城市| 钟山县| 苏尼特右旗| 邹城市| 苗栗市| 通化县| 扎囊县| 镇平县| 额济纳旗| 阳山县| 临江市| 舞阳县| 北票市| 密山市| 英山县| 化德县| 社旗县| 忻城县| 恩施市| 郑州市| 新巴尔虎左旗| 六盘水市| 焦作市| 延川县| 吴堡县| 托克逊县| 岚皋县| 新河县| 石河子市| 阿合奇县| 慈利县| 米林县| 陕西省|