天堂中文在线官网Iwww.色94色.comI狠狠撸视频I人妻无码一区二区三区久久I久久香蕉影院I福利网在线I豆花av在线I一区二区三区91I麻豆视频在线免费观看I欧美xxxx视频I国产1区2区3区I免费在线观看小视频Ia猛片免费播放I午夜福利一区二区三区I中文字幕无码人妻少妇免费I欧美激情在线看I四虎网站在线I日韩在线精品强乱中文字幕I99reeI97精品人妻一区二区三区香蕉I国内久久I日韩一区在线播放I日本特黄一级I女的被男的操I夜夜做天天干I91污网站

Contact Us

Tiny Cooling Fan programming principles

Date: 2015-5-28   Click: 1615 Times

"Tiny Cooling Fan" use zero-crossing triac trigger, controlled by the microcontroller triac off, by changing each control cycle on and turn-off thyristor communicate complete full-wave signal number to adjust the load power, and thus achieve speed control purposes. Because INT0 signal reflects frequency voltage zero-crossing time, so "Tiny Cooling Fan" as long as the external interrupt 0 interrupt service routine complete control door opening and closing, and the use of the interrupt service frequency counts to control the amount of n and judgment that every interrupted once, to be n minus 1 count, if n is not equal to 0, to maintain control level "1" to continue to open the control door; if n = 0, then the control level is reset to "0", close the control gate, SCR zero trigger pulse is not passed. Control volume requirements such "Tiny Cooling Fan" can be obtained in accordance with the control process, to achieve zero-crossing triac control, so as to achieve the effect by controlling the amount of control to achieve speed is adjustable.

Back to: Industry news

+86-0769-83660708

Home Product News Contact

主站蜘蛛池模板: 孟州市| 太仆寺旗| 宝鸡市| 田阳县| 梁河县| 乌恰县| 南皮县| 定襄县| 大同县| 金门县| 怀柔区| 财经| 同江市| 汤阴县| 赣州市| 南康市| 博爱县| 赤峰市| 青神县| 明光市| 黑水县| 津南区| 资溪县| 凌云县| 新邵县| 马公市| 体育| 喀喇| 延边| 乌海市| 盐山县| 福泉市| 寻甸| 绥芬河市| 宝鸡市| 峨眉山市| 崇明县| 上杭县| 磐石市| 神木县| 兴文县|